Start with a real project
Bring your customer’s electricity use, inverter model and site details. Discuss the Dyness battery options and documents needed for your proposal.
Build your next Dyness storage project with Dynergy in Thailand. Discuss product supply, compatibility and project requirements, then explore training and installer collaboration.

Bring your customer’s electricity use, inverter model and site details. Discuss the Dyness battery options and documents needed for your proposal.
Ask about product availability, quantities and supply requirements. Confirm the proposed configuration before preparing your customer quotation.
Tell us the provinces and project types you serve. Discuss installer collaboration, homeowner enquiries and opportunities to share your installation experience.
Reduce application preparation work with Dynergy’s grid connection support ↗
Planning a battery installation in Thailand? Tell Dynergy your province, current solar equipment and energy priorities. We can discuss your requirements and the next step for an installer enquiry.
Ask about installation ↗Installation services are provided by independent installers. Confirm their qualifications, scope of work and quotation before proceeding.

INSTALLER SUPPORT / GRID CONNECTION
You manage the installation and grid connection application. Dynergy can help with Dyness product documents, battery configuration information and guidance on the utility’s preparation steps—so your team spends less time gathering information. The installer remains responsible for the submission, technical design and site work; MEA or PEA reviews and approves the connection.
A system operating in parallel with the grid still needs the utility’s connection permission. PEA’s self-use route requires protection against exporting electricity.
PEA self-use route ↗Apply to the residential export programme. Selection and a power purchase contract are additional steps; a self-use connection does not automatically authorise electricity sales.
PEA residential export route ↗Check the electricity bill: MEA serves Bangkok, Nonthaburi and Samut Prakan; other provinces use PEA. Select self-use or the applicable export programme.
Gather customer and meter details, authorisation if applicable, drawings and equipment information. Check the current utility checklist before submitting.
Use My Energy or PPIM. Track requests for corrections and technical review. For approved exports, complete the contract and required payments.
Follow the approved design and applicable ERC requirements. Coordinate utility inspection, metering and connection testing.
Complete the utility’s connection process. Export projects also need commercial-operation confirmation under their contract. Retain approvals and handover records.
Start with a recent electricity bill, account and meter details, installation address, applicant identification and any representative authorisation.
Check the required single-line diagram, layout, inverter registration, equipment datasheets, protection settings and design certification. For hybrid systems, show the battery and backup arrangement.
Reviewed 7 October 2026. The steps above are a planning overview; documents, sequence, fees and approvals depend on the utility and project. Confirm the current official checklist before submission.
Develop your team’s knowledge of Dyness batteries and prepare for your next installation. Contact Dynergy about training, the official certification route and current regional requirements.
Enquire about certification ↗
Share your company details, provinces served, inverter experience and the battery projects you are working on.
Ask about the current certification process, available support and regional participation requirements.
Certification applications and approval are managed by Dyness. Dynergy can help you identify the next step.
The Dyness Installer Excellent Plan (IEP) includes a points programme and redemption platform. It supports installer engagement through eligible activities, membership progression and access to benefits.
Official activity examples include project case sharing, community participation and product feedback. Contact Dynergy to ask about current participation options for your region.
Ask about the IEP ↗Programme eligibility, points and rewards follow Dyness’s current rules and may vary by region.